Plans, methods and mistakes in building a traditional Irish Currach or Naomhóg.
Monday, August 26, 2013
Excuses excuses...
Monday, May 27, 2013
Gunnel Bend Construction
These are the dimensions that I will be working to, and I will start building this form today or tomorrow more than likely.
Friday, May 24, 2013
Interlude before the main event
I ordered the wood for the gunnels from the sawmill today so will hopefully hear something on that next week. In the meantime I had another leak from the same spot on the copper cylinder but I have patched it again and ran another test and got to 97degrees celcius with no leaks at all so we're ready to go on that front.
While I am waiting for the wood to be milled I will start building the form that it will bent around, going to do a more thorough job this time as I have a feeling I will be using these forms more than once. Started drawing a dimensioned plan view of it in SketchUp tonight and will finish it on Monday more than likely. I will put up a picture of this to give you an idea of the shape I will be aiming for even though the finished product may not turn out to be those exact dimensions.
Expect another post after the weekend...
Saturday, May 18, 2013
Steambox, second trial
I actually tried to go get wood today to be ready for bending the sides but the sawmill wasn't open cos it's Saturday so that will have to wait til during the week, some day when I get off early from work and can make it out there or else I'll get one of the lads to pick it up for me.
Now I am basically ready to start the building proper, next on the list is the form that the gunwales will bend around and I will have to make some kind of boom/holder for the camera so I can video things properly. As I am building the forms I will discuss the sizes and the way to lay it out
Thursday, May 16, 2013
Steambox setup
Monday, May 13, 2013
....and we're back...
So the basic overview of the steps to building the naomhog is as follows.. (or at least the way I plan to build it)
1) Build the gunwales
2) Make the tachtaí and join top and bottom gunwale
3) Make the seats and join them to the gunwale
4) Bend the ribs and fit them to the lower gunnel
5) Put the stringers on
6) Cover the currach in fabric and waterproof it
7) Make the oars and and oarlocks and go rowing!
So as before when started Currach One, one of the first things we do is steam and bend the gunwales. So we need a steambox, I decided to build this one from insulation mostly, have never really seen anyone build a steambox quite like this before so I guess we'll soon see if there's a reason for that!
As you can see on the left I made corners out of 75mm rips of ply screwed together, The steam box is obviously going to be around about 2400mm or 8ft long.
Currach Two is going to be shorter than Currach One, going to go for a length of about 17ft/5200mm this time and it will be designed for two people to row I think.
<---- That's Poutine!!
I then ripped the insulation with a straight edge and my Hilti circular saw with the bigger blade. Hooked the Hilti up to the Mafell automatic vacuum I have and it worked a treat, normally cutting insulation like this is a an awful balls and results in dust everywhere, particularly down your ENT!Sunday, March 17, 2013
Current 'state' of affairs
So have been very busy lately, had a little restoration project with Jacqui. She's breathing new life into a old chair so there quite a bit of play in the old joints (somewhat like myself) so I'll be putting that back together hopefully tomorrow. You can see it on the bench there.
So this is the workshop that the currach will be built in. At the moment it's probably one of the messiest workshops in Ireland if not the world, quite different to the pristine workshops you normally see on the net!
Lots of tidying up to be done this weekend and next week before I start laying out the frame for bending and figure out some way of creating steam. Left my wallpaper steamer in Vancouver so the next one will probably consist of a large pot and a gas flame to generate more significant quantities of steam.
As you can see the loft is very well lit now, just finished that the other night cos it only ever had one bulb that worked off a 2 way switch. Lights were kindly donated by my buddy Rob. The mission today is to get some sockets going cos at the moment I pull power by dropping a lead down through a hole in the floor and plugging in downstairs in a different shed.
The wiring is a wee bit messed up in there as I seem to have 220v comin back on a neutral from somewhere.
Video of back feed
It's not something I'm overly worried about at the moment in terms of getting things workin but I will have to chase it down as its just not good practice. There does seem to be some leakage from the electric fence for the farm which is being pulled from the lighting circuit and should really be on a separate fuse with the sockets. Probably going to get hold of a little board and practice my wiring and see if I can organise the all a bit better, might go crazy and even label some stuff!
Will update in a couple of days...
Wednesday, February 27, 2013
It's a new day and a better day's comin...
Ok so this is what has happened in the last couple of months. As can be seen above (it's a picture of the new bridge in Waterford) we are back in Ireland which of course is the home of currach building. If I wasn't bullshitting in previous posts then the process should be a little easier here than in Canada. Firstly I should be able to get the wood a lot easier, it should be cheaper and of course I should have more space to build it in.
I will be building it in a shed on a farmyaes, it's a 100 year plus building but it's completely dry and apart from some starlings who have taken up residence is all mine.
This building was previously my workshop but after 6 or 7 years of neglect could really do with a good clean and some rearranging. I also have to reconnect the power there so I can have some light in.
I reckon all this will take a couple of weeks as I have a full time job and nixers (extrs) as well so not much time at the moment. Setting a tentative start date for the next currach as 17th of March which is of course Paddys Day
Watch this space...
Saturday, December 1, 2012
Currach saved from fiery end!
Hopefully they will be able to figure out how it all goes together and we'll see it on the water next year sometime. Great to see it go to someone so I didn't have to chop it up, considering there is already about 500 dollars worth of wood gone into it it would have been a shame on a couple of levels to see it chopped.
After Christmas I hope to be up and running with a start to finish description of another currach build, this one will from the green shores of Ireland. I should be able to take the lessons learned building this one and do an even better 'how-to'. I know a couple of people on the other side that do video work so hopefully there will be more video of each step this time and that'll make it easier for woodworking novices to follow what's happening, till then....
Bon voyage...
Monday, November 26, 2012
Free half-built Currach anyone?
Save a currach!!
(This offer conveniently includes instructions on how to build a currach....)
Sunday, September 23, 2012
Broken
Have also had a number or other things going on, workwise and healthwise for my lovely lady, there's also the small matter of trying to sort out a visa. Despite having been her for 5 years we are having a major problem with not only getting our new visa, but also even getting a reply from the immigration officer involved. There's a good possibility we'll have to leave Canada (possibly in a rush) in the next little while if something doesn't move forward.
If the currach doesn't get built here then I will certainly be building one in Ireland and I will have a lot more video of it if I do it there, either way this blog will eventually be a record of how to build a currach replete with plans so don't give up on it yet ... thanks for your patience.
Thursday, July 12, 2012
Currachs are in the details...
So what's left to do?
The upper gunnel has to come together. All the wedges of the thole pins have to be done.
The mortices for the ribs and the holes for the thole pins have to be made.
All the wedges have to be cut for the thole pins. Another breasthook has to be made.
The reinforcing gussets for the upper gunnel have to be made.
All the stringers have to be glued together.
We always set this blog out to be a true record of trying to build a currach from scratch having never built a boat before. Hopefully people who are thinking of attempting this will be able to learn from our mistakes. God knows we have made plenty so far and I'm pretty sure there is more to come, they don't bother us though, both of us like working through them.
Monday, July 9, 2012
Scarf joints and stringers
Thursday, July 5, 2012
All clamped up and nowhere to go...
Sunday, July 1, 2012
Anatomy of Currachs: Tachtaí
Saturday, June 30, 2012
Tachtaí
Rainy Day Post
Thursday, June 28, 2012
Thumbs are wicked handy...
Now it starts to look like a boat...
It went really well and we got lots done.



